Ran out of boxes mid-peak? How a short-run top-up actually works

Woman tying red ribbon around a kraft box at a timber table, with an open box of tissue and a candle beside her

Daniel Bretag |

It’s 10 December and all your boxes are almost gone, but orders are still coming in and you have just worked out that the next delivery date isn’t until after Christmas.

You aren’t the first to ring us in that situation, and you won’t be the last. 

Many brands brought Black Friday forward this year, making almost the whole of November a sale. Forecasting is tough at the best of times, and sales can skyrocket past any plan you put in place.

The box count is what shows it.

This article is for the brands that didn’t start planning in August. If you did, our Christmas peak planning guide covers the early version. 

If you are reading this with a pile of orders and a thinning supply of boxes, you’re in the right place.

What we ask first

When someone rings us on 10 December, we are just seven days from closing for the holidays. 

We start with:

  1. Have you ordered from us before?
  2. Is this a product we have already made for you?
  3. Is it a plain box or a printed one?
  4. Where does it need to go, and by when?

The last one is more important than most people expect. 

We are based in Melbourne, so a delivery to Perth, Brisbane or Darwin has a travel time built in, which means there are postal cut-offs to meet. 

Everything that follows works backwards from the date you need to send the parcel out.

A new customer gets the same conversation. Nobody is told: "Sorry, no boxes for you." 

The question is what can realistically be done in the time left, and whether there is another route that will still get you where you need to be.

Repeat job or new job: the December difference

This is the biggest dividing line, and it all comes down to setup.

A repeat job is a box we have already made. The specifications haven’t changed, there is nothing new to set up and we already have the artwork on file. 

It goes back through the system, and the only real question is whether we have room on the production schedule.

A new design is a different animal.

"A custom printed box on the 10th of December is most likely not a viable option. That doesn't mean that we won't get anything to our clients." 

– Roisin Donnellan, Boxes To Go

A new design has to be set up from scratch, and there is rarely time for that as late as the second week of December. 

It doesn’t leave you without any options, and we’ll look at what else we can do to get you where you need to be.

Keep the details so a reorder stays a phone call

Every product we quote is tied to a costing number. That number follows the job from quote to order, through production, and onto the invoice, so one reference lets us see the whole history.

The simplest thing a customer can do is keep that number or an older invoice. We can usually use either thing to find the job straight away. 

If you have neither of them, a clear description of the box helps us search. We keep artwork, dielines and every revision on file. If something is missing, it’s usually because of a system change over the years.

So, before the next peak, put three things in a folder: the costing number, your last invoice and your final artwork. 

Reordering will then only require a phone call, not a full rebuild.

Top up what already works

Because a repeat job doesn’t need any new setup, the version you’re already running is the quickest to reorder. 

Changing the size, board or print method turns it into a new job, so improvements are better saved for January, when there is time to sample them properly.

Back-plan from the courier

Work from the date a parcel has to be with the carrier, not from the date you would like to have the boxes.

Australia Post publishes its last-lodgement dates for Christmas 2026. For metro Parcel Post sent from Victoria, lodged over the counter by 2.30pm, they are:

Last day to lodge a parcel for Christmas 2026 Metro Parcel Post sent from Victoria, lodged over the counter by 2.30pm
Parcel going to Last day to lodge
Within Victoria Tuesday 22 December
NSW, ACT, Queensland, SA, Tasmania Monday 21 December
Western Australia Friday 18 December
Northern Territory Wednesday 16 December

Source: Australia Post Christmas dates. These are metro dates. Other starting points and regional areas differ, so check your own route.

Express Post to most metro destinations runs to Wednesday 23 December (Tuesday 22 December for WA and NT). These are metro dates. 

Other starting points and regional areas differ, so check your own route before you plan. (Australia Post Christmas dates)

Pay attention to the Northern Territory date because it falls on the day before we close. This means that a box for a Darwin-bound order has to be in your hands well before that.

We close from about midday on Friday 18 December and reopen on Monday 4 January. Our last shipping day is Thursday 17 December. Anything we make for you has to be with you before then. 

When you add your own packing time on top, the real deadline for a top-up order is earlier than most people think.

If there is genuinely no time

Roisin's advice is to protect the delivery, not the ideal box.

"It's a lot better to get the product to the door of the customer before Christmas than miss that delivery deadline." 

– Roisin Donnellan, Boxes To Go

If a stock box can carry the product, it is often the right call to go for that option. Sometimes that means splitting an order across two boxes because the product doesn’t fit in one. 

The stock range doesn’t suit every product, and we don’t pretend that it does. However, a plain box that arrives in time beats a perfect one that doesn't.

One customer described a December job this way in a Google review:

“Amazing team and amazing service. I had a last minute emergency custom order I needed right before Christmas and the guys smashed it out for me in less than 24 hours. Legends.”

Customer review · Boxes To Go

That is one customer's experience. We don’t make guarantees for any turnaround because every job depends on the box, the artwork and what is already on the floor. 

What the review does show is that asking early gives everyone the most options and the best chance of getting their box in time.

In short

  • Know your ship-by date, and work backwards from it.
  • Repeat jobs are realistic in December. New custom designs usually aren’t.
  • Keep the costing number, last invoice and artwork for every box you order.
  • Top up what you already run. Save changes for January.
  • If time runs out, a stock box that arrives beats a custom box that doesn’t.

The earlier you call us, the more choice you have. That is true on 10 December and equally true in September.


Counting boxes and not liking the number? We make everything in Melbourne, do short runs with low minimum order quantities, and will tell you plainly what can be done in the time you have. 